I have included the newly updated space study in this posting.  You can see the changes listed below.  I have broken up the pdf into smaller pieces. 

  • Scheduled roof replacements for East Rochester, Gonic, RMS, William Allen, and McClelland have been integrated into the document
  • Restrooms at Gonic were re-located to be closer to plumbing , these are the second floor bathrooms
  • Lighting replacement was added to Gonic’s improvements
  • A future addition location is shown on Chamberlain (T-Shaped as an option)
  • The cost on light fixtures for Maple Street was updated.
  • The cost on the elevator foundation on William Allen was updated
  • The priority ranking was defined on page 87
  • 7 minor spelling errors were corrected throughout the document

 

Rochester Study_FrontEnd

CapitalImprovementsPlan

Appendix

WilliamAllenSchool

SchoolStreetSchool

RochesterMiddleSchool

NancyLoud

McClellandSchool

MapleStreetSchool

GonicSchool

EastRochesterSchool

ChamberlainStreetSchool

 

Comments are closed.